West Union/Thompson roads (FY 2018-20 URMD Pedestrian Safety)

West Union and Thompson Road URMD logoProject Description
Both West Union and Thompson roads need continuous sidewalks to improve pedestrian safety.

We plan to fill in sidewalk gaps along the north side of these roads, between Bronson Creek Drive and 153rd Terrace, and a segment of sidewalk on the south side of West Union Road, connecting to 148th Place. We will also build ADA-compliant ramps, relocate a waterline and install stormwater drains and streetlights.


Funding Information
Cost is $1.2 million (2020 estimate). Funding is through the Urban Road Maintenance District (URMD).